Location: |
Canary Wharf, London |
Sector: |
Commercial |
Sq Ft: |
191130 |
Sq M: |
17000 |
Floors: |
10 |
|
|
Developer: |
Canary Wharf Contractors Ltd |
Tenant: |
Shell |
Architect: |
Pringle Brandon |
M&E Designer: |
Aecom |
Main Contractor: |
Overbury |
Electrical Contractor: |
Bancroft |
|
Luminaire Qtys: |
4318 |
|
|
Integration: |
BMS |
AC Network: |
T-Bus |
Dimming: |
DALI |
Emerg Mon: |
ATS DALI |
BREEAM: |
- |
|
|
Install Yr: |
2011 |
|
|
|
|
Designed to extremely high standards as their headquarters, this project was for Shell occupying 10 floors of the 32-storey building known as HQ3 in Canary Wharf developments. Technology does not stop at the aesthetics because good design is matched behind the scenes where building data for improvement is well managed. "Project Pippin" stands for Implementation of a Process Plant Information Warehouse. |
|
BMS interface via BACNET IP. Interface to Card reader to control lighting and save energy whenever the occupant removes their security ID card to certain rooms. RS232 AV interfaces. 625 LCMs, 1041 sensors, 291 scene plates |
|